Metro cut-and-cover section
The problem
A cut-and-cover metro box takes continuous seepage through its sides. Ordinary pumps clear the water but block every few hours on the fine silt that comes with it, and each blockage means sending someone down to clear the strainer.
What we would supply
Two GA-150 6" dewatering pumps with high-chrome impellers and oversized suction strainers on monthly rental, plus one GA-100 on site as standby. At commissioning we set the suction so the intake sits clear of the silt bed rather than in it.
Why this set-up
Wear-resistant impellers and larger strainers are what stop silt blockages, and a standby pump keeps the box dry while a duty pump is serviced. Monthly hire matches the length of the works without a capital purchase.
- Sector
- Infrastructure / metro
- Set-up
- 2 × GA-150, 1 × GA-100 standby
- Arrangement
- Monthly rental
- Typical duration
- Length of the works